Thursday, January 20, 2011

The Windows made an Entrance

The new windows recently arrived from Tiltco in Ontario, Canada. At approximately 500 pounds each, it was quite an effort to get the windows off the truck and into our new space. Each window is two double Tilt And Turn factory mulled units at 13 ft. wide by 6 ft. high. These windows were selected to meet the aggressive insulating value required for our super-insulated skin.


Tuesday, January 18, 2011

Defining Spaces
















The forum space is beginning to take shape. The perimeter walls have been framed. The opening in the upper floor has not yet been cut, as the crews upstairs are using this area for staging scaffolding to install windows and drywall to the clerestory monitor above.